¿Cuándo empezó la construcción del Puente de Carlos sobre el Moldava?
Work begins on Charles Bridge
Začátek stavby Karlova mostu
1357. The foundation stone of the stone bridge over the Vltava was laid in 1357.
Dónde: Chequia
Qué pasó
The foundation stone of the stone bridge over the Vltava was laid in 1357. A popular modern theory, from the astronomer Zdeněk Horský in 1979, puts it on 9 July at 5:31 in the morning — a moment that reads the same both ways, 1-3-5-7-9-7-5-3-1 — but no document records the day. The bridge is traditionally credited to Peter Parler's workshop and took some fifty years to finish. It was simply the Stone Bridge until about 1870, when it was named after Charles. Most of the statues came between 1707 and 1714.
Dilo
Karlův most spojuje Staré Město a Malou Stranu.
Charles Bridge joins the Old Town and the Lesser Town.
Para leer más
- Antes: Charles IV founds a university
- Después: Jan Hus is burned at Constance